USEOF WASTE
Is stored, disposed of or sold for 1 UAH/kg to companies that produce polymer hatches and tiles
Complex
- GAS
- HEATING
FUEL - TECHNICAL
CARBON - ELECTRIC
ENERGY - PETROL,
DIESEL - FUEL
BRIQUETTES
For your company's own needs
or/and for sale
EQUIPMENT COMPLEX
IS NECESSARY FOR THE MANUFACTURERS OF:
NOW
WITH Green Plastic COMPLEX
≈ 22 M savings per year
heating fuel
with a profit
of UAH 20 M/year
Manufacture of gas and oil products — is one of the most profitable and promising businesses:
- due to the critical shortage of heating fuel and electricity in Ukraine;
- it is the most renewable energy resource in the world.
for several months ahead
on the basis of two BMTU-6 plants with a volume of loading chambers of 6 m3 and one IVECO gas genset with a capacity of 180 kW, operating on excess pyrolysis gas
GET THE CALCULATION OF PROFITK/month expenses for the complex
M/month income from sold products
ABOUT
Green Plastic
EQUIPMENT COMPLEX
The pyrolysis technology, which we use to process rubber and plastic into useful products, is well known worldwide.
For more than 100 years, Finland and Germany have been creating expensive plants that work using high-temperature pyrolysis.
This is an important difference of Green Plastic
Our specialists used low-temperature pyrolysis.
This is what allows us to make small modular plants that can be placed all over Ukraine where the right types of waste are concentrated, put a gasholder and a GGS there and manufacture oil products from waste, i. e. heating fuel, and electricity from free gas
WHY WERE THERE NO
SUCH PLANTS IN UKRAINE?
Before the war, the payback rate for such equipment was 5 years. The plants were made from Mariupol metal using Kharkiv electronics.
Heating fuel at the time of operation of coke plants cost UAH 12/l, while now it costs UAH 30/l, and technical carbon costs UAH 800/t instead of UAH 5,000/t
When the electricity cost was 3 UAH/kWh, manufacturers did not care about the energy independence of their companies
Today, the issue of energy autonomy is crucial for every household
Currently, the Green Plastic complex pays for itself in 12 months and costs
5 times cheaper than European analogues with the same functionality and performance
WHAT THE GREEN PLASTIC
Green Plastic CONSISTS OF
WE GUARANTEE
and quality indicators we declare in contracts
of raw materials at UAH 2/kg in the volume required for manufacture
the manufactured energy
The payback rate of the complex is reduced to 8 months when the number of plants is increased to 3
YOU CERTAINLY WANT TO GET THE ANSWER TO THE QUESTION
“HOW WILL I GET THIS 20 MILLION BACK IN A YEAR?”
Detailed calculation of profit and expenses of the complex for the 1st year, P&L
- EBITDA: UAH 5,679,200
- Net profit margin: 70,6%
- Internal rate of return: 4,4%
- Return on investment: 9,2%
- Return on assets: 10,4%
- Operating cycle: 4 days
We calculate that 1 plant with a loading volume of 6 m3 processes 3 tons of raw materials per day
Every day, 3 tons of raw materials worth UAH 2/kg are needed for processing, the costs are:
- day = UAH 6 000
- month = UAH 180,000
- year = UAH 2,160,000
with a selling price of UAH 30/l
- day = UAH 54,000
- month = UAH 1,620,000
- year = UAH 19,440,000
- day = UAH 14,400
- month = UAH 432,000
- year = UAH 5,180,000
- day = UAH 2,500
- month = UAH 75,000
- year = UAH 900,000
The equipment complex is already in operation at our production site in Chernivts
So we can demonstrate and confirm all calculations by personal example
Moreover, the Green Plastic team has implemented
over 75 projects in the energy and processing industry
Over 15 of our pyrolysis technology-based plans operate effectively in Ukraine
A plant with a loading volume of 6 m³
A plant with a loading volume of 6 m³ to process waste rubber, plastic and liquid fuel waste (used oil, fuel oil after long-term storage)
Manufactured: 6 plants
They are used at the fuel production plant in Fastiv
Power plant with a capacity of 2.7 MW
Power plant with a capacity of 2.7 MW, operating on sunflower pellets
It was launched in 2017 at the plant of the electricity producer from renewable energy sources, PGS Energiia, LLC, Zaporizhzhia
A plant with a loading volume of 2.5 m³
A plant with a loading volume of 2.5 m³ to process waste rubber, plastic and liquid fuel waste (used oil, fuel oil after long-term storage)
Manufactured: 1 plant
It is used at FORTAN, LLC since 2017, Cherkasy region
ARE THERE ANALOGUES OF Green Plastic?
Let's compare the complexes
- Cost
- Delivery
- Staff
training
пуста строка - Equipment
maintenance - Choice of premises
- UAH 20 M
- free
- free
пуста строка
пуста строка - free
1st month - free
- Cost
- Delivery
- Staff
training
пуста строка - Equipment
maintenance - Choice of premises
- UAH 20 M
- UAH 10 M
- UAH 40 K
one professional’s
per diem - no
пуста строка - no
- Cost
- Delivery
- Staff
training
пуста строка - Equipment
maintenance - Choice of premises
- UAH 100 M
- UAH 500 K
- UAH 60 K
one professional’s
per diem - no
пуста строка - no
ONLY 3 MONTHS REQUIRED
TO LAUNCHTHE COMPLEX
Step 1
Together we prepare terms of reference and draft an offer
We identify what resource and the amount of waste you have and what type of energy you want to obtain, since the company structure that we will offer depends on this.
If it is building a business from scratch, we provide options of regions where you can take the necessary waste and explain how to sell the products.
If you already have your own premises, a generator or a tank farm, we remove these elements from the cost.
Everything is tailored.
Step 2
You make an advance payment and in 3 months the complex is ready for operation
All equipment will be assembled at your production site, and all necessary documentation will be prepared.
Step 3
Over the next 2 weeks, we will train your employees to manage the complex
We continue to advise and support your project free of charge during the 1st month. Further — as agreed.
Green Plastic TEAM
ALL TOGETHER WE FIGHT FOR THE INDEPENDENCE OF UKRAINE, AND ENERGY AUTONOMY IS ONE OF ITS IMPORTANT COMPONENTS
What is more, we will clear the country of the two most dangerous wastes in the world: rubber and plastic